PEB Studio
Production · QA/QC & traceability (MES)

F.4 Welding reports by WPS

Every weld is recorded against the right welder, the right WPS and revision, and a valid qualification – the data for the welding traceability record (MDR) delivered to the client.

What it does

  • Select the welders authorised for the WPS, the actual WPS and the welds; unauthorised welders are greyed out and rejected by the server.
  • Rejected when the qualification has expired, has lapsed for more than 6 months or is out of range (process, position, thickness, material).
本页对您有帮助吗?

更新于 01 Nov 2026

仍需要帮助?

我们的产品专家会用您的语言回复,通常在 4 个工作小时内。