PEB Studio
مركز الدعم

معرفة صناعة الفولاذ

خبرة عملية لمصنّعي الفولاذ وموردي PEB — الخلفية وراء كل رقم يحسبه PEB Studio.

ابدأ من هنا
What is a pre-engineered building (PEB)? A pre-engineered building is a steel building whose frames, secondary members and cladding are designed as a system and fabricated in the factory to suit one project – f… PEB & steel structures قراءة 3 دقائق Steel grades and mill certificates (EN 10204 3.1) How to read S355JR, A572 Gr 50, SS400 or Q355B, how grades compare across standards, and what a 3.1 inspection certificate proves. Steel materials & fasteners قراءة 2 دقائق The steel fabrication process, step by step How a structural member travels from the detailing model to the container: numbering, drawings, cutting, drilling, fit-up, welding, inspection, blasting, painting, packi… Fabrication & welding قراءة 2 دقائق Welding basics for steel fabricators Welding processes and their ISO 4063 numbers, fillet versus butt welds, throat and leg size, and the documents behind every weld: WPS, WPQR and welder qualification. Fabrication & welding قراءة 2 دقائق Execution classes, ITPs and hold points EXC1–EXC4 in EN 1090-2, CC1–CC4 in AS/NZS 5131 and ISO 3834 quality levels: what they demand from the shop, and how inspection and test plans with hold and witness point… Quality & corrosion protection قراءة 2 دقائق Shipping structural steel in containers Which container fits which members, payload and centre of gravity, securing and dunnage, VGM, seals and the document set the client expects. Logistics & export shipping قراءة 2 دقائق
PEB & steel structures3 مقالات

How pre-engineered buildings and structural steel frames are put together, from primary frames to purlins, and how they are erected.

Steel materials & fasteners2 مقالات

Steel grades in the main standards, mill certificates and traceability, and the bolts that hold a structure together.

Quality & corrosion protection2 مقالات

Execution classes, quality management systems, inspection and test plans, blast cleaning, paint systems and galvanising.

Logistics & export shipping1 مقالات

Containers, loading, securing, VGM, seals, wooden packaging and the documents that travel with a steel shipment.

ما زلت بحاجة إلى مساعدة؟

يجيب أخصائيو المنتج بلغتك، عادةً خلال 4 ساعات عمل.