PEB Studio
Production · QA/QC & traceability (MES)

F.1 Operating principles

The principles that keep production data reliable and compliant with quality standards.

What it does

  • Production complete ≠ QC passed: a stage with an inspection moves to Awaiting QC; only the QC Inspector confirms PASS / FAIL.
  • Scanning a QR code grants no rights – users still have to sign in; permissions are checked on the server.
  • History is never overwritten: every report, inspection and correction is a separate record; corrections keep the old / new value, approver and reason.
  • Output is never double-counted: when several people work on a piece, factory tonnage is counted once and each person records their share.
  • Workers with history are never deleted (only resigned / inactive / transferred); editing a process never changes the status of completed components automatically.
¿Le ha resultado útil esta página?

Actualizado el 01 Nov 2026

¿Sigue necesitando ayuda?

Nuestros especialistas de producto responden en su idioma, normalmente en menos de 4 horas laborables.