PEB Studio
Project information, sharing & categories

D.1 Project information & team in charge

A single place for all project information: entered once, reused by every module and every exported document (material requisition, packing list, reports…), so they are always consistent.

What it does

  • 6 groups: General (status Quotation → … → Warranty, fabrication standard, surface protection, contract tonnage, delivery deadline), Client & site, Team in charge (Sales, PM, design engineer, QA/QC), Material requisition, Dispatch (shipper, consignee, notify party, Incoterms, ports, vessel, ETD, shipping marks) and Signatures.
  • Pick the person in charge from the user accounts (name, position, e-mail and phone are taken over) or type them in for the project.
Apakah halaman ini membantu?

Diperbarui 01 Nov 2026

Masih butuh bantuan?

Spesialis produk kami menjawab dalam bahasa Anda, biasanya dalam 4 jam kerja.