PEB Studio
Fitur

I Smart Erection – on-site erection management

Physical component register, QR codes and component passports, status-coloured BIM model, grids and coordinates, erection sequence, simulation, 4D schedule, logistics → site, inspection and NCR, drawings, client portal, field app and digital handover.

I.1 Erection dashboard Quantities fabricated / shipped / delivered / installed / accepted, NCRs, missing components and the planned vs. actual curve on a single screen. Smart Erection – on-site erection management 2 menit baca I.2 Component Register, QR Scanner & Component Digital Passport Scan the factory label or the Smart Erection label to get the component's full “passport”: engineering, fabrication, QC, logistics, erection position, inspections, NCRs… Smart Erection – on-site erection management 2 menit baca I.3 Smart Erection Navigator & status-coloured BIM Model Viewer Enter or scan a mark → the camera flies to the location, the component is highlighted in orange and connected components in blue, with grid / elevation / step / containe… Smart Erection – on-site erection management 2 menit baca I.4 Erection Grid, coordinates & Erection Zones Component positions are described in site language (G/13, A/1–3, D–E/2–3). The site coordinate system is proposed and approved – the original IFC coordinates are never c… Smart Erection – on-site erection management 2 menit baca I.5 Erection Planning, Installation Guides & Interactive 3D Erection Player The sequence is proposed from the geometry (base plates → columns → bracing → beams / rafters → purlins), with dependencies and a CPM schedule, and must be approved toge… Smart Erection – on-site erection management 2 menit bacaLanjutan I.6 4D BIM Schedule & Installation Progress updates Compare plan and actual day by day directly on the model (early / on time / late). The person updating progress cannot accept their own work; accepted data is never over… Smart Erection – on-site erection management 2 menit baca I.7 Logistics → site: containers, receiving, storage yard, erection readiness Know in advance which component is in which container and where it will be erected; alerts for components needed early but arriving late. The Ready for Erection level fo… Smart Erection – on-site erection management 2 menit baca I.8 Inspection & NCR, Technical Issues & Drawing Management Installation quality is documented: checklists by inspection type, PASS / FAIL / CONDITIONAL, and NCRs with a responsible person and a due date. Drawings have statuses a… Smart Erection – on-site erection management 2 menit baca I.9 Client portal, share links & Field app Clients and contractors are invited into their own project only, or view it via a share link with a defined scope, expiry and PIN. The field app (PWA) works even offline… Smart Erection – on-site erection management 2 menit baca I.10 Digital Installation Handover & Reports Handover dossiers (partial, by zone or final) are generated automatically from the data – component register, progress, inspections, NCRs, drawings, logistics, receiving… Smart Erection – on-site erection management 2 menit baca

Masih butuh bantuan?

Spesialis produk kami menjawab dalam bahasa Anda, biasanya dalam 4 jam kerja.