PEB Studio
Smart Erection – on-site erection management

I.1 Erection dashboard

Quantities fabricated / shipped / delivered / installed / accepted, NCRs, missing components and the planned vs. actual curve on a single screen.

What it does

  • Every physical component has a Physical Component ID (PC00001) and a QR ID, generated automatically from the IFC.
  • Roles: SUPPLIER ADMIN / PM / ENGINEERING, CUSTOMER ADMIN, SITE MANAGER, INSTALLATION SUPERVISOR, QC INSPECTOR, VIEWER.
Apakah halaman ini membantu?

Diperbarui 01 Nov 2026

Masih butuh bantuan?

Spesialis produk kami menjawab dalam bahasa Anda, biasanya dalam 4 jam kerja.