PEB Studio
Smart Erection – on-site erection management

I.4 Erection Grid, coordinates & Erection Zones

Component positions are described in site language (G/13, A/1–3, D–E/2–3). The site coordinate system is proposed and approved – the original IFC coordinates are never changed automatically.

What it does

  • Reads the grid (IfcGrid) and elevations from the IFC, or creates / edits them manually; check points and deviations before confirmation.
  • Zones by grid range and elevation: number of components, weight and % delivered / installed / accepted.
이 페이지가 도움이 되었나요?

01 Nov 2026 업데이트

아직 도움이 필요하신가요?

제품 전문가가 귀하의 언어로, 보통 4 영업시간 이내에 답변드립니다.