What it does
- Container-to-Erection Mapping: select a container / package → the components inside are highlighted on the model.
- Site Receiving: confirm container arrival, check the seal, scan packages, condition, complete – discrepancies (missing, excess, wrong container, damaged).
- Site Storage: yard areas, locations, assignment of packages / components – found instantly in the passport and the navigator.
Limits and points to check
“Ready for Erection” considers only materials, drawings and quality; it does not replace the on-site safety assessment.