What it does
- 11 inspection types (grid position, elevation, alignment, plumbness, connections, bolts, site welding, temporary stability, foundations / anchor bolts, final acceptance) with editable checklists.
- Technical issues (missing components, damage, incorrect installation, drawing clarification…) tracked until closed.
- Drawings: DRAFT → FOR REVIEW → APPROVED → IFC → SUPERSEDED → AS-BUILT; files open only through the system.