What it does
- Loading tracking: internal dimensions / door / tare / payload, planned / actual rows, progress and packages loaded.
- Multiple plans with revisions, locked once approved; check results VALIDATED / WARNING / NOT VERIFIED.
- Suggestions based on the erection sequence: packages needed first are loaded near the door.
Limits and points to check
The loading plan supports planning; it is not a lashing / securing safety certification.

Véase también
¿Le ha resultado útil esta página?
¡Gracias por su opinión!
Actualizado el 01 Nov 2026