What it does
- Loading tracking: internal dimensions / door / tare / payload, planned / actual rows, progress and packages loaded.
- Multiple plans with revisions, locked once approved; check results VALIDATED / WARNING / NOT VERIFIED.
- Suggestions based on the erection sequence: packages needed first are loaded near the door.
Limits and points to check
The loading plan supports planning; it is not a lashing / securing safety certification.

Xem thêm
Trang này có hữu ích không?
Cảm ơn phản hồi của bạn!
Cập nhật 01 Nov 2026