What it does
- Loading tracking: internal dimensions / door / tare / payload, planned / actual rows, progress and packages loaded.
- Multiple plans with revisions, locked once approved; check results VALIDATED / WARNING / NOT VERIFIED.
- Suggestions based on the erection sequence: packages needed first are loaded near the door.
Limits and points to check
The loading plan supports planning; it is not a lashing / securing safety certification.

関連項目
このページは役に立ちましたか?
フィードバックありがとうございます!
01 Nov 2026 更新