What it does
- 16 PDF reports (progress, installation register, by zone, planned vs. actual, inspections, NCRs, missing components, drawings, productivity, container → erection, receiving, storage locations, readiness, completion, Installation Manual, QR labels) and Excel.
- Data administration: integrity checks, audit trail, backup / restore; a new IFC revision keeps PCIDs and installation data.
Cette page vous a-t-elle été utile ?
Merci pour votre retour !
Mis à jour le 01 Nov 2026