What it does
- 16 PDF reports (progress, installation register, by zone, planned vs. actual, inspections, NCRs, missing components, drawings, productivity, container → erection, receiving, storage locations, readiness, completion, Installation Manual, QR labels) and Excel.
- Data administration: integrity checks, audit trail, backup / restore; a new IFC revision keeps PCIDs and installation data.
本页对您有帮助吗?
感谢您的反馈!
更新于 01 Nov 2026