PEB Studio
Smart Erection – on-site erection management

I.10 Digital Installation Handover & Reports

Handover dossiers (partial, by zone or final) are generated automatically from the data – component register, progress, inspections, NCRs, drawings, logistics, receiving, photos – with a SHA-256 manifest and versioned as R1, R2…

What it does

  • 16 PDF reports (progress, installation register, by zone, planned vs. actual, inspections, NCRs, missing components, drawings, productivity, container → erection, receiving, storage locations, readiness, completion, Installation Manual, QR labels) and Excel.
  • Data administration: integrity checks, audit trail, backup / restore; a new IFC revision keeps PCIDs and installation data.
이 페이지가 도움이 되었나요?

01 Nov 2026 업데이트

아직 도움이 필요하신가요?

제품 전문가가 귀하의 언어로, 보통 4 영업시간 이내에 답변드립니다.