PEB Studio
機能

G Weld management & project benchmarking

Weld register with revisions and approval, deposited weld metal, welding consumables and cost, multi-project comparison and consumable forecasts for new projects.

G.1 Portfolio overview View the entire project portfolio through weld metrics normalised per tonne of steel, filtered by client, country, year or type. Weld management & project benchmarking 約 2 分で読めます G.2 Recalculation from IFC, revisions, verification & approval Every model change creates a new revision; approved revisions are locked and never overwritten. Compare two revisions to see welds added, removed or changed and the impa… Weld management & project benchmarking 約 2 分で読めます G.3 Detailed weld register Complete the weld data from the drawings – weld type, joint type, size, position, process, WPS – so that deposited metal is calculated correctly. Bulk editing and file i… Weld management & project benchmarking 約 2 分で読めます G.4 Project summary, welding consumables & welding cost Calculates deposited metal, wire / electrodes, flux, gas and preliminary welding hours per process (SMAW, GMAW, FCAW, SAW, GTAW) – the basis for ordering welding consuma… Weld management & project benchmarking 約 2 分で読めます G.5 Project comparison, analytics & material forecast Compare 2–20 projects against a baseline project to see differences in weld density, deposited metal and consumables per tonne. Forecast consumables for a new project as… Weld management & project benchmarking 約 2 分で読めます G.6 Reports A – H & settings Professional reports with register numbers, revisions and prepared / checked / approved blocks; Excel with formulas for re-checking. Weld management & project benchmarking 約 2 分で読めます

まだお困りですか?

製品スペシャリストが御社の言語で、通常 4 営業時間以内に回答します。