G Weld management & project benchmarking
Weld register with revisions and approval, deposited weld metal, welding consumables and cost, multi-project comparison and consumable forecasts for new projects.
G.1
Portfolio overview
View the entire project portfolio through weld metrics normalised per tonne of steel, filtered by client, country, year or type.
G.2
Recalculation from IFC, revisions, verification & approval
Every model change creates a new revision; approved revisions are locked and never overwritten. Compare two revisions to see welds added, removed or changed and the impa…
G.3
Detailed weld register
Complete the weld data from the drawings – weld type, joint type, size, position, process, WPS – so that deposited metal is calculated correctly. Bulk editing and file i…
G.4
Project summary, welding consumables & welding cost
Calculates deposited metal, wire / electrodes, flux, gas and preliminary welding hours per process (SMAW, GMAW, FCAW, SAW, GTAW) – the basis for ordering welding consuma…
G.5
Project comparison, analytics & material forecast
Compare 2–20 projects against a baseline project to see differences in weld density, deposited metal and consumables per tonne. Forecast consumables for a new project as…
G.6
Reports A – H & settings
Professional reports with register numbers, revisions and prepared / checked / approved blocks; Excel with formulas for re-checking.