PEB Studio
기능

G Weld management & project benchmarking

Weld register with revisions and approval, deposited weld metal, welding consumables and cost, multi-project comparison and consumable forecasts for new projects.

G.1 Portfolio overview View the entire project portfolio through weld metrics normalised per tonne of steel, filtered by client, country, year or type. Weld management & project benchmarking 2분 소요 G.2 Recalculation from IFC, revisions, verification & approval Every model change creates a new revision; approved revisions are locked and never overwritten. Compare two revisions to see welds added, removed or changed and the impa… Weld management & project benchmarking 2분 소요 G.3 Detailed weld register Complete the weld data from the drawings – weld type, joint type, size, position, process, WPS – so that deposited metal is calculated correctly. Bulk editing and file i… Weld management & project benchmarking 2분 소요 G.4 Project summary, welding consumables & welding cost Calculates deposited metal, wire / electrodes, flux, gas and preliminary welding hours per process (SMAW, GMAW, FCAW, SAW, GTAW) – the basis for ordering welding consuma… Weld management & project benchmarking 2분 소요 G.5 Project comparison, analytics & material forecast Compare 2–20 projects against a baseline project to see differences in weld density, deposited metal and consumables per tonne. Forecast consumables for a new project as… Weld management & project benchmarking 2분 소요 G.6 Reports A – H & settings Professional reports with register numbers, revisions and prepared / checked / approved blocks; Excel with formulas for re-checking. Weld management & project benchmarking 2분 소요

아직 도움이 필요하신가요?

제품 전문가가 귀하의 언어로, 보통 4 영업시간 이내에 답변드립니다.