PEB Studio
Weld management & project benchmarking

G.4 Project summary, welding consumables & welding cost

Calculates deposited metal, wire / electrodes, flux, gas and preliminary welding hours per process (SMAW, GMAW, FCAW, SAW, GTAW) – the basis for ordering welding consumables and pricing. Missing inputs are reported as “Missing data”, never treated as 0.

What it does

  • DEMO project example: 73.18 t of steel, 6,705 m of welds, 91.6 m/t, 818.9 kg of deposited metal, 887.6 kg of consumables (12.13 kg/t).
  • Transparent formulas: cross-section area by weld type → m = A × L × ρ → consumables = m ÷ η; gas by arc time.
  • Consumable cost from the effective unit rates (rate history kept); labour is a separate preliminary estimate; costs are filtered on the server for users without permission.

Limits and points to check

Process factors are reference values – the welding engineer checks them against the WPS / manufacturer data and confirms them in Settings.

Project summary, welding consumables & welding cost

이 페이지가 도움이 되었나요?

01 Nov 2026 업데이트

아직 도움이 필요하신가요?

제품 전문가가 귀하의 언어로, 보통 4 영업시간 이내에 답변드립니다.