PEB Studio
Wiki

Glossaire A–Z

Des définitions courtes des termes utilisés dans PEB Studio et dans la fabrication, le soudage, le colisage et le montage de l’acier.

A

Anchor bolt
Bolt cast into the foundation that holds a column base plate. Its position, level and projection are surveyed before erection. Voir aussi: Steel erection: sequence, stability and site checks
Assembly
A fabricated piece made of a main part and the secondary parts welded or bolted to it in the shop, e.g. a column with its base plate and cleats. Voir aussi: B.4 Assembly, Part, Material take-off and Bolt lists
Assembly mark
The identifier given by Tekla numbering to identical assemblies (e.g. RF-1). It describes a type of piece; each physical piece also gets a serial. Voir aussi: Component identity: mark, serial, PCID and QR
Awaiting QC
Status of a production stage that the team has confirmed as completed but that still needs a QC inspection before the next stage can start. Voir aussi: Production statuses, hold points and NCR flow

B

B/L (bill of lading)
Transport document issued by the carrier for sea freight: receipt for the goods, evidence of the contract of carriage and document of title.
BOM (bill of materials)
The complete list of assemblies, parts, materials and bolts of a project with quantities, dimensions and weights, generated in PEB Studio from the IFC. Voir aussi: B.4 Assembly, Part, Material take-off and Bolt lists · B.9 Excel BOM & CSV export
Built-up section
An I-section welded from three plates (two flanges and a web) instead of being rolled. Typical for PEB frames, often tapered. Voir aussi: What is a pre-engineered building (PEB)?

C

CC1–CC4 (construction category)
Classes of AS/NZS 5131 that scale fabrication and erection requirements, similar to execution classes in EN 1090-2. Voir aussi: AS/NZS 5131 Structural steelwork – Fabrication and erection
CHS / RHS / SHS
Circular, rectangular and square hollow sections, written as Ø×t (CHS) or H×B×t (RHS / SHS). Voir aussi: Structural steel sections and how they are written
CJP / PJP
Complete and partial joint penetration butt welds. A CJP weld fuses the full thickness of the joint; a PJP weld only part of it. Voir aussi: Welding basics for steel fabricators
Component Digital Passport
The page opened by scanning a component on site: engineering, fabrication, QC, logistics, position, inspections, NCRs and photos of that piece. Voir aussi: I.2 Component Register, QR Scanner & Component Digital Passport
CSC plate
Safety approval plate on every container under the International Convention for Safe Containers, showing among others the maximum gross mass and tare. Voir aussi: Shipping structural steel in containers
CTU Code
IMO/ILO/UNECE code of practice for packing and securing cargo in containers and other cargo transport units. Voir aussi: CTU Code IMO/ILO/UNECE Code of Practice for Packing of Cargo Transport Units
Cutting plan
Layout of parts on stock sheets or bars that tells the cutting shop what to cut from which material, and purchasing how much to buy. Voir aussi: C.2 Plate and section cutting plan results · Cutting optimisation and how to keep scrap below 3 %

D

DFT (dry film thickness)
Thickness of a cured paint coat or system, measured in µm with a gauge – a standard QC record before release. Voir aussi: ISO 12944 Paints and varnishes – Corrosion protection of steel structures by protective paint systems
Digital project dossier
Online collection of released packing lists, shipping marks, reports, photos and certificates that the client opens from the QR code on a package. Voir aussi: H.10 International-standard shipping marks & digital project dossier
DSTV / NC file
Text file format for CNC drilling, sawing and cutting machines; its header contains the piece mark, which PEB Studio uses to link the file. Voir aussi: B.8 Drawings and fabrication files (PDF, DXF, NC/DSTV) · Supported file formats
Dunnage
Timber or other material used to support, separate and protect cargo in a container; wooden dunnage must comply with ISPM 15. Voir aussi: ISPM 15 Regulation of wood packaging material in international trade

E

EXC1–EXC4 (execution class)
Classes of EN 1090-2 that set the level of requirements for fabricating and erecting a steel structure; most buildings are EXC2. Voir aussi: EN 1090-2 Execution of steel structures – Technical requirements · Execution classes, ITPs and hold points

F

Fillet weld
Weld of roughly triangular cross-section joining two surfaces at an angle, as in a T-joint or lap joint. Sized by throat a or leg z (a ≈ 0.7 z). Voir aussi: Welding basics for steel fabricators
Fit-up
Positioning secondary parts on the main part and tack-welding them before full welding; usually followed by a dimensional check. Voir aussi: The steel fabrication process, step by step

G

Girt
Horizontal secondary member on a wall that carries the wall cladding to the columns, usually a cold-formed C or Z section.
GUID
Globally unique identifier of an object instance in the IFC model; PEB Studio shows it on the part and assembly pages. Voir aussi: Component identity: mark, serial, PCID and QR

H

HDG (hot-dip galvanising)
Corrosion protection by dipping fabricated steel in molten zinc, to ISO 1461. Voir aussi: ISO 1461 Hot dip galvanized coatings on fabricated iron and steel articles
Heat number
Number of the steel cast from which a product was made; it links a plate or section to its mill certificate. Voir aussi: Steel grades and mill certificates (EN 10204 3.1)
Hold point
Point in a process where work must stop until a defined inspection has been done and released. In PEB Studio, later stages cannot exceed the quantity accepted by QC. Voir aussi: E.5 Production process & QC hold points per project · Execution classes, ITPs and hold points

I

IFC
Industry Foundation Classes (ISO 16739), the open BIM exchange format. PEB Studio builds its BOM, 3D and identities from the IFC exported by Tekla Structures. Voir aussi: ISO 16739 (IFC) Industry Foundation Classes for data sharing in construction · B.1 Upload a Tekla project folder
Incoterms
ICC rules (e.g. FOB, CIF, DAP) that define which party pays for and bears the risk of each part of the transport. Never translated on documents.
ITP (inspection and test plan)
Document listing every inspection from incoming material to dispatch, with criteria, frequency, responsible party and hold / witness / review points. Voir aussi: Execution classes, ITPs and hold points

K

Kerf
Width of material removed by the cut (laser, plasma, saw). It is allowed for in nesting and cutting plans. Voir aussi: C.1 Settings & scrap-reduction levers

M

Master PKL
Packing list of a whole container, made of packages (Sub-PKL) and directly packed components. Voir aussi: Packing hierarchy: shipment, container, package
MDR (manufacturer's data record)
Quality dossier delivered to the client: certificates, WPS, welder qualifications, inspection and NDT reports, NCRs and coating records. Voir aussi: F.12 Traceability & audit log
Method statement
Document prepared by a competent person describing how a task – e.g. erection – will be done safely: equipment, sequence, temporary works and controls. Voir aussi: Steel erection: sequence, stability and site checks
MR (material requisition)
Internal request to purchase or issue material, generated in PEB Studio from the cutting plans with a 3-level signature block. Voir aussi: C.4 Material requisition (MR)
MTC (mill test certificate)
Inspection document from the steel mill, usually type 3.1 to EN 10204, with chemistry and mechanical test results of the delivered product. Voir aussi: EN 10204 Metallic products – Types of inspection documents

N

NCR (non-conformance report)
Record of a result outside the acceptance criteria, with disposition and corrective action. Flow: OPEN → CORRECTIVE ACTION → RE-INSPECTION → CLOSED. Voir aussi: F.8 QA/QC workflow, inspection queue & workshop NCR · Production statuses, hold points and NCR flow
NDT (non-destructive testing)
Inspection methods that do not damage the part: visual (VT), magnetic particle (MT), penetrant (PT), ultrasonic (UT) and radiographic (RT) testing. Voir aussi: Welding basics for steel fabricators
Nesting
Arranging part outlines on a sheet to minimise waste before cutting. Voir aussi: Cutting optimisation and how to keep scrap below 3 %
Numbering (Tekla)
Tekla Structures function that gives identical parts and assemblies the same mark. Must be run before exporting the IFC. Voir aussi: Exporting a clean IFC from Tekla Structures: checklist

P

Part mark
Identifier of identical single parts (plates, profiles) in the model; shown in the Parts list, on cutting plans and in NC files. Voir aussi: Component identity: mark, serial, PCID and QR
PCID (Physical Component ID)
Identifier of one physical component in Smart Erection (PC00001…), stable across model revisions and linked to its QR ID. Voir aussi: Component identity: mark, serial, PCID and QR · I.1 Erection dashboard
PEB (pre-engineered building)
Steel building whose frames, secondary members and cladding are designed as a system and fabricated for one project. Voir aussi: What is a pre-engineered building (PEB)?
PKL (packing list)
List of the contents of a package or container with weights and dimensions. Client copies are produced only from the released version. Voir aussi: H.2 PKL editor & eligible component selection · H.8 Client packing list
Preloaded bolt
High-strength bolt tightened to a specified tension so the joint resists slip by friction, supplied as a matched set (e.g. EN 14399). Voir aussi: Structural bolts: grades, sets and tightening
Primary frame
Columns and rafters of a PEB forming portal frames, usually built-up tapered sections. Voir aussi: What is a pre-engineered building (PEB)?
Property class (bolts)
Strength marking of metric bolts such as 8.8 or 10.9: first number × 100 = tensile strength in MPa. Voir aussi: Structural bolts: grades, sets and tightening
Purlin
Secondary roof member spanning between rafters that carries the roof sheeting, usually a cold-formed C or Z section. Voir aussi: B.3 Component groups

Q

QR ID
Code printed on a component label. It contains only the project, type, reference and an HMAC signature – no data or rights. Voir aussi: Component identity: mark, serial, PCID and QR · J.1 Server-side permissions & QR codes without rights

R

Remnant
Usable leftover of a sheet or bar above a minimum size (e.g. 300 × 300 mm plate, 1 m bar), returned to stock and not counted as scrap. Voir aussi: C.1 Settings & scrap-reduction levers
Revision (R1, R2…)
Numbered version of a weld register, handover dossier or document. Approved revisions are locked; changes create a new revision. Voir aussi: G.2 Recalculation from IFC, revisions, verification & approval · I.10 Digital Installation Handover & Reports

S

Sa 2½
Very thorough blast-cleaning grade of ISO 8501-1, the usual surface preparation for structural paint systems. Voir aussi: ISO 8501-1 Preparation of steel substrates before application of paints – Visual assessment of surface cleanliness
Scrap rate
Share of purchased material that becomes waste: 1 − net part weight ÷ gross material issued. PEB Studio targets 3 %. Voir aussi: Cutting optimisation and how to keep scrap below 3 %
Serial (Item n / N)
Number that identifies one physical piece among identical pieces of the same mark, printed on its label. Voir aussi: Component identity: mark, serial, PCID and QR
SHA-256
Cryptographic fingerprint stored with released documents and dossiers; any change to the file changes the hash, proving the document is the approved version. Voir aussi: Security and data principles
Shipping mark
Marking on a package (consignee, reference, destination, package n / N, handling symbols) per UN/ECE Rec. 15 and ISO 780. Voir aussi: UN/ECE Rec. 15 · ISO 780 Simpler shipping marks · Pictorial marking for handling of goods · H.10 International-standard shipping marks & digital project dossier
Smart Erection
PEB Studio module for site: receiving, storage, erection sequence, installation progress, inspections and the digital handover. Voir aussi: I.1 Erection dashboard
Splice
Joint made in a member that is longer than the available stock; at most one per part, with the position approved by the designer. Voir aussi: C.2 Plate and section cutting plan results
Sub-PKL
Packing list of one package inside a container, with its own number and QR label (e.g. PKG-0726-0001). Voir aussi: Packing hierarchy: shipment, container, package · H.3 Packages (Sub-PKL) & QR scan-to-pack

T

Tack weld
Short weld that holds parts in position during fit-up before the final welding.
Throat thickness (a)
Height of the largest triangle inscribed in a fillet weld; the size used in European practice (a ≈ 0.7 × leg). Voir aussi: Welding basics for steel fabricators

V

VGM (verified gross mass)
Total weight of a packed container that the shipper must declare before loading on a ship, under SOLAS chapter VI. Voir aussi: SOLAS VI/2 (VGM) Verified gross mass of packed containers

W

Weld density
Metres of weld per tonne of steel (m/t), used to compare projects and forecast consumables. Voir aussi: G.5 Project comparison, analytics & material forecast · Estimating deposited metal and welding consumables
Welder qualification
Certificate showing a welder passed a test for a process, position and range (e.g. ISO 9606-1); kept valid by 6-monthly confirmation. Voir aussi: ISO 9606-1 Qualification testing of welders – Fusion welding – Part 1: Steels
Witness point
Inspection point the client is notified of and may attend; work may continue if they do not. Voir aussi: Execution classes, ITPs and hold points
WPQR / PQR
Welding procedure qualification record: the test result that qualifies a welding procedure and supports one or more WPS. Voir aussi: ISO 15614-1 Specification and qualification of welding procedures – Welding procedure test – Part 1: Arc and gas welding of steels
WPS (welding procedure specification)
Document that tells the welder how to make a weld: process, consumables, position, thickness range, preheat and parameters. Voir aussi: F.11 WPS, PQR, welder qualifications & WPS authorisation · Welding basics for steel fabricators

Besoin d’aide supplémentaire ?