PEB Studio
Smart Erection – on-site erection management

I.1 Erection dashboard

Quantities fabricated / shipped / delivered / installed / accepted, NCRs, missing components and the planned vs. actual curve on a single screen.

What it does

  • Every physical component has a Physical Component ID (PC00001) and a QR ID, generated automatically from the IFC.
  • Roles: SUPPLIER ADMIN / PM / ENGINEERING, CUSTOMER ADMIN, SITE MANAGER, INSTALLATION SUPERVISOR, QC INSPECTOR, VIEWER.
War diese Seite hilfreich?

Aktualisiert am 01 Nov 2026

Brauchen Sie noch Hilfe?

Unsere Produktspezialisten antworten in Ihrer Sprache, meist innerhalb von 4 Arbeitsstunden.