PEB Studio
Smart Erection – on-site erection management

I.1 Erection dashboard

Quantities fabricated / shipped / delivered / installed / accepted, NCRs, missing components and the planned vs. actual curve on a single screen.

What it does

  • Every physical component has a Physical Component ID (PC00001) and a QR ID, generated automatically from the IFC.
  • Roles: SUPPLIER ADMIN / PM / ENGINEERING, CUSTOMER ADMIN, SITE MANAGER, INSTALLATION SUPERVISOR, QC INSPECTOR, VIEWER.
本页对您有帮助吗?

更新于 01 Nov 2026

仍需要帮助?

我们的产品专家会用您的语言回复,通常在 4 个工作小时内。