PEB Studio
Smart Erection – on-site erection management

I.1 Erection dashboard

Quantities fabricated / shipped / delivered / installed / accepted, NCRs, missing components and the planned vs. actual curve on a single screen.

What it does

  • Every physical component has a Physical Component ID (PC00001) and a QR ID, generated automatically from the IFC.
  • Roles: SUPPLIER ADMIN / PM / ENGINEERING, CUSTOMER ADMIN, SITE MANAGER, INSTALLATION SUPERVISOR, QC INSPECTOR, VIEWER.
このページは役に立ちましたか?

01 Nov 2026 更新

まだお困りですか?

製品スペシャリストが御社の言語で、通常 4 営業時間以内に回答します。