PEB Studio
Smart Erection – on-site erection management

I.1 Erection dashboard

Quantities fabricated / shipped / delivered / installed / accepted, NCRs, missing components and the planned vs. actual curve on a single screen.

What it does

  • Every physical component has a Physical Component ID (PC00001) and a QR ID, generated automatically from the IFC.
  • Roles: SUPPLIER ADMIN / PM / ENGINEERING, CUSTOMER ADMIN, SITE MANAGER, INSTALLATION SUPERVISOR, QC INSPECTOR, VIEWER.
이 페이지가 도움이 되었나요?

01 Nov 2026 업데이트

아직 도움이 필요하신가요?

제품 전문가가 귀하의 언어로, 보통 4 영업시간 이내에 답변드립니다.