Support centre
How can we help you today?
Step-by-step guides, every feature explained, steel-industry knowledge, standards and the PEB Studio wiki — in your language.
Step-by-step guides
Do a task from start to finish, one numbered step at a time.
13 guides
Feature reference A–J
Every PEB Studio feature: who uses it, why it matters, what it does and its limits.
74 features
Steel industry knowledge
Pre-engineered buildings, sections, grades, welding, coating, shipping and erection.
13 articles
Standards library
EN 1090, ISO 3834, AWS D1.1, ISO 6346, SOLAS VGM… and where PEB Studio applies them.
26 standards
PEB Studio wiki
How the software thinks: identities, statuses, roles, data rules, formats and FAQ.
12 pages · 66 terms
Popular guidesAll guides
Request an account and sign in
Register with your company e-mail, get approved by an administrator and sign in securely.
Explore the demo project
Install the complete sample project to train your teams without touching live data.
Upload a Tekla project folder
Drag and drop the folder exported from Tekla: the IFC is analysed and drawings are linked automatically.
Create an optimised cutting plan
Set sheet sizes, bar lengths and scrap-reduction levers, then check scrap against the 3 % target.
Features
All features Browse the software module by module
APlatform & system administration6 features
BTekla IFC model analysis & BOM9 features
COptimised cutting plans & material requisition4 features
DProject information, sharing & categories4 features
EProduction reporting, labels & QR traceability6 features
FProduction · QA/QC & traceability (MES)13 features
GWeld management & project benchmarking6 features
HPacking, packing lists & containers13 features
ISmart Erection – on-site erection management10 features
JSecurity, data & general principles3 features
Steel knowledge
See all Learn the trade
Execution classes, ITPs and hold points
EXC1–EXC4 in EN 1090-2, CC1–CC4 in AS/NZS 5131 and ISO 3834 quality levels: what they demand from the shop, and how inspection and test plans with hold and witness point…
Shipping structural steel in containers
Which container fits which members, payload and centre of gravity, securing and dunnage, VGM, seals and the document set the client expects.
The steel fabrication process, step by step
How a structural member travels from the detailing model to the container: numbering, drawings, cutting, drilling, fit-up, welding, inspection, blasting, painting, packi…
Steel grades and mill certificates (EN 10204 3.1)
How to read S355JR, A572 Gr 50, SS400 or Q355B, how grades compare across standards, and what a 3.1 inspection certificate proves.
Standards
See all Standards you work to
EN 1090-2 ISO 3834 ISO 5817 EN 10204 ISO 6346 SOLAS VI/2 (VGM) AS/NZS 5131 AWS D1.1 AS/NZS 1554.1 ISO 9606-1 ISO 15614-1 ISO 4063
Wiki
Glossary A–Z Key concepts
- PEB Studio in one page: modules and data flowPEB Studio reads the IFC from Tekla Structures and manages the whole life of every steel member: BOM, cutting…
- Component identity: mark, serial, PCID and QRHow PEB Studio tells pieces apart: assembly and part marks from Tekla, a serial for each physical piece (Item…
- Production statuses, hold points and NCR flowCompleted is not the same as QC passed. How a component moves through its stages, when it waits for QC, and h…
- Roles and permissions: who uses whatDepartments, positions and project roles, how permissions are combined, and which features each department us…
- Frequently asked questionsShort answers to the questions new users ask most: models, numbering, welds, permissions, QR codes, languages…
Still need help?
Our product specialists answer in your language, usually within 4 business hours.