What it does
- Inspection step: required / optional / sampling %, hold / witness / review, standard, measurements (min / max), mandatory photos / documents, ITP.
- PASS / FAIL with defect (porosity, undercut, dimensional deviation…) and disposition (redo, repair, accept with approval, reject); a waiver requires a reason and an approver.
- Re-inspection #2, #3… after repair; full history on the component page.
Véase también
- GuíasGestionar puntos de espera de calidad y abrir una no conformidad
- NormasISO 5817 Welding – Fusion-welded joints in steel – Quality levels for imperfections
- NormasAWS D1.1 Structural Welding Code – Steel
- NormasAS/NZS 1554.1 Structural steel welding – Welding of steel structures
- Conocimiento del aceroExecution classes, ITPs and hold points
¿Le ha resultado útil esta página?
¡Gracias por su opinión!
Actualizado el 01 Nov 2026