What it does
- Inspection step: required / optional / sampling %, hold / witness / review, standard, measurements (min / max), mandatory photos / documents, ITP.
- PASS / FAIL with defect (porosity, undercut, dimensional deviation…) and disposition (redo, repair, accept with approval, reject); a waiver requires a reason and an approver.
- Re-inspection #2, #3… after repair; full history on the component page.
Lihat juga
- PanduanMenjalankan titik tahan QC dan membuat NCR
- StandarISO 5817 Welding – Fusion-welded joints in steel – Quality levels for imperfections
- StandarAWS D1.1 Structural Welding Code – Steel
- StandarAS/NZS 1554.1 Structural steel welding – Welding of steel structures
- Pengetahuan bajaExecution classes, ITPs and hold points
Apakah halaman ini membantu?
Terima kasih atas masukan Anda!
Diperbarui 01 Nov 2026