What it does
- Inspection step: required / optional / sampling %, hold / witness / review, standard, measurements (min / max), mandatory photos / documents, ITP.
- PASS / FAIL with defect (porosity, undercut, dimensional deviation…) and disposition (redo, repair, accept with approval, reject); a waiver requires a reason and an approver.
- Re-inspection #2, #3… after repair; full history on the component page.
함께 보기
이 페이지가 도움이 되었나요?
의견을 보내 주셔서 감사합니다!
01 Nov 2026 업데이트