PEB Studio
Production · QA/QC & traceability (MES)

F.8 QA/QC workflow, inspection queue & workshop NCR

QC works from a queue and inspects to the right standard (ISO 5817, AWS D1.1, AS/NZS 1554.1, EN 1090-2); every FAIL is kept as evidence. An NCR follows the flow OPEN → CORRECTIVE ACTION → RE-INSPECTION → CLOSED, and only QC can close it.

What it does

  • Inspection step: required / optional / sampling %, hold / witness / review, standard, measurements (min / max), mandatory photos / documents, ITP.
  • PASS / FAIL with defect (porosity, undercut, dimensional deviation…) and disposition (redo, repair, accept with approval, reject); a waiver requires a reason and an approver.
  • Re-inspection #2, #3… after repair; full history on the component page.