What it does
- Inspection step: required / optional / sampling %, hold / witness / review, standard, measurements (min / max), mandatory photos / documents, ITP.
- PASS / FAIL with defect (porosity, undercut, dimensional deviation…) and disposition (redo, repair, accept with approval, reject); a waiver requires a reason and an approver.
- Re-inspection #2, #3… after repair; full history on the component page.
另请参阅
本页对您有帮助吗?
感谢您的反馈!
更新于 01 Nov 2026